Preparing Administration Set (Pump Module)
For instructions on how to go from checking in a Pump Module
to preparing it for an infusion setup, see "General Setup and
Operation".
1.
If a new set is being loaded, prime set (see "Priming"
procedure).
2.
Open Pump Module door.
3.
Load administration set, as follows:
a.
Hold upper fitment above fitment
recess and lower into recess.
b.
Ensure tubing is not twisted.
®
Alaris
System (with v9 Model 8000) DFU
Pump and Syringe Modules Section
Loading
FU
RATE (mL/h)
CHANNEL
SELECT
PAUSE
CHANNEL
OFF
RESTART
WARNINGS
• To prevent a potential free-flow
condition, ensure no extraneous
object (for example, bedding,
tubing, glove) is enclosed or
caught in the Pump Module door.
• Administration Sets:
Use only Pump Module/
♦
Gemini Infusion System
administration sets. The use
of any other set may cause
improper instrument operation,
resulting in an inaccurate
fluid delivery or other
potential hazard. For a list
of compatible sets, reference
the Set Compatibility Card
(provided separately).
Discard if packaging is not
♦
intact or protector caps are
unattached.
CAUTIONS
• Before operating instrument,
verify that administration set is
free from kinks and installed
correctly in instrument.
• Insert upper fitment before
installing safety clamp* fitment.
• When reloading an
administration set, leave the
safety clamp* fitment in the
closed position (see "General
Information", "Safety Clamp
Fitment").
* "Safety clamp" is referred to on
the device as "Flo-Stop".
Getting Started
2-3