Pump Replacement Tube Procedure - Cardinal Health CHB-AGS Instructions For Use Manual

Single slide automated gram stainer
Table of Contents

Advertisement

8.1.5 Open the new Gram Stain Kit and insert the labeled cannula into the corresponding reagent bottles.
8.1.6 From the Main Menu, Press [ 2 ] on the key pad to select SET-UP.
8.1.7 Press [ 2 ] on the key pad to select Consumables
8.1.8 Press [ 1 ] on the key pad to select Review Reagents.
This display will show the current kits information.
8.1.9 Press [ 1 ] on the key pad to select Change Kit
The display will now should the preregistration menu. At this menu, the instrument reminds the operator that a Scrub Cycle is required before the
installation of a new reagent kit. Refer to section 9.3 for details on how to run a Scrub Cycle. Once the Scrub has completed, the old reagent bottles may be
replaced with new ones.
8.1.10 Once the blinking cursor appears next to the Kit Number, use the key pad to enter in the Kit Number as it reads on the new reagent kit label.
8.1.11 Using the key pad, enter in the Lot Number and Expiration Date into the appropriate fields as it reads on the new reagent kit label.
8.1.12 Press [ # ] on the key pad to select Accept and save the kit registration information.
8.1.13 Press [ * ] on the key pad once
8.1.14 Press [ 1 ] on the key pad to Update Reagent Log and activate the kit.
Entry of invalid numbers or numbers from a previously used Gram Stain Kit, will result in the display of an error message.

8.2 Pump Replacement Tube Procedure

All eight pump tubes must be replaced to ensure proper function of the Single Slide Automated Gram Stainer at least every six months, depending on
frequency of use. The Single Slide Automated Gram Stainer keeps track of the number of tubing cycles remaining, and will notify when a new pump tube
kit is necessary. Each replacement tubing kit will last 1,100 cycles, see section 9.0 for routine maintenance.
8.2.1 Press [ 1 ] on the key pad to select Run
8.2.2 Press [ 4 ] on the key pad to select Purge, repeat this step twice to make sure all of the reagents are emptied from the tubes.
8.2.3 Turn the unit OFF
8.2.4 Open the front panel by removing the four thumb screws.
All eight pump tubes and rollers will be displayed. It is recommended to replace one tube at a time from left to right to keep correct tube placement.
12
CHBAGS_GramStainer_IFU.indd 12
Art specifications:
IFU/Manual - 8"Wx10"H
Do not alter art or size.
All art prints PMS 185 Red and
100% Black.
AMS1800062
Rev. 0 2018-06
Single Slide Automated Gram Stainer User Manual
7/3/18 1:31 PM

Advertisement

Table of Contents
loading

Table of Contents