YASKAWA MP3000 Series Setup Manual page 50

Machine controller system
Hide thumbs Also See for MP3000 Series:
Table of Contents

Advertisement

2.1 MP3200 Installation
2.1.6 Battery Installation and Replacement
6.
Press the cable back into the CPU Unit.
7.
Close the cover on the CPU Unit and confirm that the BAT indicator on the CPU Unit is
not lit.
This concludes the Battery replacement procedure.
2-22
Lit.
Not lit.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mp3200Mp3300

Table of Contents