Ntp 113-2: G-010V-P Ont Installation - Alcatel-Lucent 7302 Information Manual

Intelligent services access manager
Table of Contents

Advertisement

NTP 113 — Replace a G-010V-P ONT
5
Connect the VDSL cables to the ONT.
i
ii
6
If required, have approved service personnel who are trained to work with optic
fiber clean the fiber optic connection. See DLP
fiber optic handling, inspection, and cleaning.
7
Connect the fiber optic cable to the ONT.
i
ii
NTP 113-4
November 2013
Connect the VDSL line from the CPE to the VDSL port using an RJ-45
connector, as shown in Figure
ONT through this connection using a PSE injector located on the customer
premises, as show in Figure
Figure NTP 113-2: G-010V-P ONT installation
Technical Area
LPWR
RPWR
PON
VDSL
ALM
G-010V-P
OLT
Connect the VDSL line from the central office to the CO LINE port using an
RJ-45 connector. This line will be used only if the unit is not powered by the
CPE VDSL line.
Danger — Fiber optic cables transmit invisible laser light. To avoid eye
damage or blindness, never look directly into fibers, connectors, or
adapters.
Route the fiber optic cable to the ONT.
Plug the SC/APC adaptor into the fiber optic port (DLP 125).
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
NTP
113-1. Reverse power is provided to the
NTP
113-2.
Customer Premises
Power
insertion
module
134
for more information about
Edition 01
ONT Product Information Guide
Customer
equipment
( VDSL2)
PSU
(PoE)
23852
3FE 55873 AAAA TCZZA

Advertisement

Table of Contents
loading

This manual is also suitable for:

73607330

Table of Contents