Alcatel-Lucent 7302 Information Manual page 470

Intelligent services access manager
Table of Contents

Advertisement

6 — ONT management using an ONT interface
Download state
Idle
Downloading
Writing to flash
Complete
This section shows you how to check the status of a software download.
Prerequisites
The prerequisites are:
The user access level of the ONT is read-write.
The ONT is connected to the GPON.
The steps to access the interface are completed.
Procedures using HTTP interface
The following procedure provides the steps to check the status of the software
download from the P-OLT to the ONT using the HTTP interface.
6-38
November 2013
Table 6-10 Software download states
Description
There is no download activity.
Software is being downloaded from the P-OLT to the ONT.
Software updates are being written to memory.
Software download is complete.
Note —
The ONT changes from one operational state to another as
the software download progresses, as follows:
SW_DLD_IDLE, when there is no software download activity
SW_DLD_START, when the software download is initiated
SW_DLD_IP, when the software download is in progress
SW_DLD_DONE, when the software download is complete
SW_DLD_FAIL, when the software download failed
See section
6.6
for more information about checking the operational
state of an ONT.
See Procedure
6-1
for HTTP interface using the first Ethernet port.
See Procedure
6-4
for CLI interface using the first Ethernet port.
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
Edition 01
3FE 55873 AAAA TCZZA
ONT Product Information Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

73607330

Table of Contents