Alcatel-Lucent 7302 Information Manual page 648

Intelligent services access manager
Table of Contents

Advertisement

NTP 112 — Install a G-010V-P ONT
7
Connect the SC/APC fiber optic cable (DLP 125).
8
Optionally, install the power supply according to manufacturer specifications and
connect the power cable to the ONT. The unit receives reverse power through the
VDSL line.
9
Verify the ONT LEDs, voltage status, and optical signal levels (DLP 127).
10
Activate and test the services (DLP 128).
11
If used, configure the SLID (DLP 129).
12
STOP. This procedure is complete.
NTP 112-4
November 2013
Caution — Units must be powered by a Listed or CE approved and
marked limited power source power supply with a minimum output rate
of 12 V dc, 1.25 A.
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
Edition 01
3FE 55873 AAAA TCZZA
ONT Product Information Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

73607330

Table of Contents