Schlage PIB300 User Manual page 333

Hide thumbs Also See for PIB300:
Table of Contents

Advertisement

Mechanical Installation
Wall Plate
Installation
!
NOTE
Select an installation location based on the guidelines provided in Planning an Installation
on page 7.
For the following instructions protect the HandReader from the dust and debris generated
during the wall plate installation process.
1. Remove the wall plate from the packing carton. Refer to Figure 4-1 for all wall plate
references in the following section.
2 UPPER SCREWS
3. Measure and mark a point 48 1/2 inches (123 cm) from the surface of the finished
floor. This point will correspond to where the top-center point of the HandReader
should be mounted.
4. For a hollow wall, drive a small nail into the wall at the mark and hang the wall plate
from the leveling hole located near the top of the wall plate.
5. For a solid wall, hold the wall plate against the wall, centering the leveling hole over
the mark in the wall.
HOLE
SURFACE
CONDUIT
ENTRY
Figure 6-2: Wall Plate
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pib301

Table of Contents