Mechanical Installation
Select an installation location based on the guidelines provided in the Planning
an Installation section beginning on page 11.
Wall Plate
Installation
For the following instructions protect the HandPunch from the dust and debris
NOTE
generated during the wall plate installation process.
Remove the wall plate from the packing carton. Refer to Figure 3-1 for all
1.
wall plate references in the following section.
Figure 3-1: Wall Plate
Measure and mark a point 42 1/2 inches (123 cm) from the surface of the
2.
finished floor. This point will correspond to where the top-center point of the
HandPunch should be mounted.
For a hollow wall, drive a small nail into the wll at the mark and hang the
3.
wall plate from the leveling hole located near the top of the wall plate.
For a solid wall, hold teh wall plate against the wall, centering the leveling
4.
hole over the mark in the wall.
2 UPPER SCREWS
3 LOWER SCREWS
HandPunch 3000/4000 Manual
LEVELING HOLE
SURFACE
CONDUIT
ENTRY
23