Figure 30
An atrium
Consider the following points to deploy in an atrium:
Plan atriums to the full height.
Plan an atrium as one full size room, not floor by floor.
Place cell centers within an atrium only if you intend for them to cover
the atrium.
Do not place cell centers in an atrium if you intend for them to serve
adjacent areas.
To serve adjacent areas, place the cell centers into these areas.
Deploy the atrium first if the atrium is more than one-third the size of
the building, or more than one cell in size.
If cell centers in adjacent dense areas serve one floor of an atrium,
verify the coverage of the cell on all of the floors that meet with the
atrium.
High rise buildings Deploy a high rise building as an unusual type of
multi-floor deployment.
Test through-the-floor coverage first. If there is no through-the-floor
coverage, deploy each floor. Repeat the deployment for all floors with the
same layout. In all other cases deploy floor by floor. You must deploy a
floor with many meeting rooms deploys differently from how you deploy
an area with cubicles.
Unusual conditions No precise steps exist to follow when you deploy in
unusual condition, but you must consider several points.
Nortel Communication Server 1000
SIP DECT Fundamentals
NN43120-123 02.02 30 March 2010
Copyright © 2008-2010 Nortel Networks. All Rights Reserved.
System deployment 61