52 Site planning and hardware deployment
Figure 21
Example of new critical points (P8 and P9)
Mark and label new critical points.
Procedure 10
Marking and labeling new critical points
Step
1
Mark new cell contours and a new cell boundary.
Action
Mark and label these new critical points on the floor plan with the
following symbol.
For more information, see
cell boundary on the floor plan" (page
Nortel Communication Server 1000
SIP DECT Fundamentals
NN43120-123 02.02 30 March 2010
Copyright © 2008-2010 Nortel Networks. All Rights Reserved.
Procedure 8 "Marking and labeling the
50).
--End--