Nortel CS 1000 Manual page 279

Sip dect fundamentals
Hide thumbs Also See for CS 1000:
Table of Contents

Advertisement

Installing a C4710E basestation in an external housing with an external antenna 279
5
Snap the cover of the C4710E basestation to the rear side, to
close the basestation cabinet. Fasten the cabinet by mounting
the two screws into the two holes in the rear side of the cabinet.
6
Unlock the cabinet, and open the cabinet door.
7
Remove the foam cover and foam blocks from the cabinet.
8
Mount the swivel, and route the incoming cable through the
swivel.
9
Verify that the cable fits snugly into the waterproof inlet housing.
10
Connect the incoming cable to the connection box that is
delivered with the outdoor cabinet.
11
Connect the CAT5 cable that is inside the outdoor cabinet to the
connector box.
12
Connect the Ethernet CAT5 cable to the C4710E basestation.
Place the basestation in the outdoor cabinet and install the foam.
Nortel Communication Server 1000
NN43120-123 02.02 30 March 2010
Copyright © 2008-2010 Nortel Networks. All Rights Reserved.
SIP DECT Fundamentals

Advertisement

Table of Contents
loading

Table of Contents