Pilot Hose 5 - Kubota KX080-3 Workshop Manual

Hide thumbs Also See for KX080-3:
Table of Contents

Advertisement

5.Pilot hose 5

(A)
Pbu 1
PB1
PAI
(a)
AK5
BK5
R:
L:
(b)
AK4
BK4
D:
U:
(c)
AK3
BK3
Lo:
Hi:
P3
T2
(d)
AK2
BK2
Bw:
Fw:
(e)
AK1
BK1
Bw:
Fw:
P2
P1
T1
P
PF1 PP3
(f)
A1
B1
Cr:C
Du:
(g)
A2
B2
Cr:
Du:
(h)
A3
B3
Lo:
Hi:
(i)
A4
B4
D: U:
PLS
(j)
A5
B5
L: R:
(B)
32
31
30
18
(D)
24
22
29
28
21
23
(k)
(o)
27
PF2
PP2
(l)
(r)
(q)
(m)
(n)
19
17
14
PB2
12
13
20
(u)Valve assembly
15
(swivel shuttle)
26
25
16
No.
12
Shuttle valve – C/V (swivel left)
13
Shuttle valve – C/V (swivel right)
14
Relay plate – C/V (arm dump)
15
Shuttle valve – C/V (arm crowded)
16
Relay plate – C/V (bucket crowded)
17
Relay plate – C/V (bucket dump)
18
Relay plate – C/V (boom confluence Pbu)
19
Relay plate – C/V (boom confluence Pbu)
(C)
20
Relay plate – C/V (boom down)
L: R:
21
Travel P/V (left forward) – C/V (left forward)
22
Travel P/V (left backward) – C/V (left backward)
23
Travel P/V (right forward) – C/V (right forward)
24
Travel P/V (right backward) – C/V (right backward)
25
Swing P/V (left) – C/V (swing left)
26
Swing P/V (right) – C/V (swing right)
27
Relay plate – C/V (dozer up) Dozer (up)
28
Relay plate – C/V (dozer down) Dozer (down)
29
SP1 solenoid (high pressure) – C/V (SP1 high pressure)
30
SP1 solenoid (low pressure) – C/V (SP1 low pressure)
31
SP2 solenoid (high pressure) – C/V (SP1 high pressure)
32
SP2 solenoid (low pressure) – C/V (SP1 low pressure)
(p)
(AA)
11
(E)
(r)Swivel (left)
L:
R:
(s)Arm (crowded)
(t)Swivel (right)
Location
Tapecolor
Swivel (right)
Sky-blue
Swivel (left)
Gray
Arm (dump)
Blue
Arm (crowded)
Yellowish green
Bucket (crowded)
Orange
Bucket (dump)
Red
Boom (up)
Green
Boom (confluence, up)
Green
Boom (down)
Yellow
Travel (left, forward)
Red
Travel (left, backward)
Blue
Travel (right, forward)
Yellow
Travel (right, backward)
Green
Swing (left)
Orange
Swing (right)
Yellowish green
Dozer (up)
Pink
Dozer (down)
Brown
SP1 (high pressure)
Pink
SP1 (low pressure)
Brown
SP2 (high pressure)
Pink
SP2 (low pressure)
Brown
(A)Control valve assembly
(B)Valve assembly (unload)
(C)Valve assembly (PV, travel)
(D)Valve assembly (proportional)
(E)(Used for the swing pedal)
Valve assembly (pilot, OFF)
(a)Swivel
(b)Dozer
(c)SP2
(d)Travel left
(e)Travel right
(f)Arm
(g)Bucket
(h)SP1
(i)Boom
(j)Swing
(k)Dozer (up)
(l)Bucket (dump)
(m)Boom (up)
(n)Boom (down)
(o)Dozer (down)
(p)Adaptor (pilot hose, 1)
(q)Arm(dump)(r)
Bucket (crowded)
(AA)(View A)
L:(Left)
R:(Right)
D:Down
U:Up
Lo:Low
Hi:High
Bw:Backward
Fw:Forward
Cr:Crowded
Du:Dump
Q'ty
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents