WSM KX080-3 Service
(4) Bucket cylinder
(5) Swing cylinder
(6) Dozer cylinder
1. Position the boom and arm as showm at left.
2. Measure the bucket cylinder full stroke operating time.
1. Position the boom, arm and bucket as showm at left.
(with the bottom of the bucket about 1 m (33 ft) above
from the ground.)
2. Measure the swing cylinder full stroke operating time.
(right to left and left to right)
1. Place the bucket on the ground. Position the machine
as shown at left for the dozer to make a full stroke.
2. Measure the dozer cylinder full stroke operating time.
IV-S-57
Hydraulic system