WSM KX080-3 Service
(6)(7)(8)(9)(10)
(11)(12)(13)
(1)(2)(3)
(15)(16)(17)(18)(19)
(20)(21)(22)(23)
g.Dozer lever
1.Adjusting the dozer lever neutral position
Fit the lever in position as shown at left.
2.Checking the setup condition
Make sure the valve spool moves over its full
stroke.
Make sure the valve spool moves smoothly.
3.DU bushing bearing
Apply grease.
4.Tightening torque of bracket (dozer pilot
valve)
Tightening torque of rod end
Tightening torque =
23.5~27.5N.m(2.4~2.8kgf/m)17.3~20.3ft.lbs
(1)Rod end right-hand screw
(2)Nut
(3)Spring washer
(4)Grip (bi-speed)
(5)Pan-head machine screw
(6)Lever assembly (blade)
(7)Lever (blade)
(8)Bushing
(4)(5)
(9)Plain washer
(10)Snap pin
(11)69mm(2.7inch)
(12)65mm(2.6inch)
(13)127mm(5.0inch)
(14)Cover (right, upper, A/C)
(15)Bracket (dozer PV)
(16)Bolt
(17)Rod end left-hand screw
(18)Nut
(19)Spring washer
(20)Rod assembly (blade)
(24)
(21)Rod (M8-150)
(22)Nut
35(1.4in)
(23)Left-hand screw 8
(14)
(24)Neutral position
II-S-34
Machine body