Omron FH series User Manual page 341

Hide thumbs Also See for FH series:
Table of Contents

Advertisement

Output Control: Synchronization Control
Operation When [Number of Delay] Is Set to 2
The signal is turned OFF when the BUSY signal turns ON.
ON
STEP signal
OFF
ON
BUSY signal
OFF
OR signal
DO signal
ON
GATE signal
OFF
1
Repeatedly turn ON the STEP signal while the BUSY signal is OFF.
2
The Overall Judgment (OR) signal is output when BUSY signal is turned from ON to OFF.
3
When the STEP signal turns ON for the third time, the measurement results (DO) for the first
time that the STEP signal turned ON are output and the GATE signal is turned ON after the
time set for the GATE ON delay has elapsed.
4
When the STEP signal turns ON for the fourth time, the measurement results (DO) for the
second time that the STEP signal turned ON are output and the GATE signal is turned ON
after the time set for the GATE ON delay has elapsed.
*1:
A delay of up to 1 ms will occur when the GATE signal is turned ON. (This applied only to the FH.)
5
Each time the STEP signal turns ON after that, the measurement result (DO) from when the
STEP signal turned ON two times previously is output.
Vision System FH/FZ5 Series User's Manual
for Communications Settings (Z342)
(1)
(2)
(3)
ON while measurements are being processed
Overall judgement
Overall judgement
result for (1)
result for (2)
The results for (1) is output when the STEP signal
turns ON the third time.
(Result not
Result for (1)
output.)
GATE ON delay
Delay time
(1 ms max.)
Output time
(4)
(5)
Overall judgement
Overall judgement
Overall judgement
result for (3)
result for (4)
result for (5)
Result for (2)
Result for (3)
Result for (4)
*1
Parallel Communications
2
339

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fz5 series

Table of Contents