Testing Communications - Omron FH series User Manual

Hide thumbs Also See for FH series:
Table of Contents

Advertisement

Testing Communications

Use the following procedure to check the communications status with the external devices connected with a
parallel interface. You can check whether wiring and communications settings have been performed correctly.
1
On the Main Window, select [Tool] − [System Settings] − [Communication].
2
Select [System Settings] − [Communication] − [Parallel] from the tree view on the left.
The Parallel View is displayed.
3
Click [Confirmation] to check the I/O status.
Input state
Output state
318
Parallel Communications
View
STEP0 to STEP7
Only the settings for
STEP0 and STEP1 are
valid for an FZ5-1100
series Sensor Controller.
DSA0, DSA1
DI0 to DI7
DI LINE0 to DI LINE2
Valid only for an FH-1000/
FH-3000 series Sensor
Controller.
RUN
ERR
BUSY
OR
GATE
READY
ACK
DO0 to DO15
The input status of each signal from the external device to the Controller
is displayed.
When a signal is input, the background color changes to red.
The output status of each signal is displayed.
When a signal is output, the background color changes to red.
The output status from each signal of the Controller to external devices
can be specified.
Changes between ON and OFF and between 0 and 1 can be simulated
without performing measurement.
Vision System FH/FZ5 Series User's Manual
Description
for Communications Settings (Z342)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fz5 series

Table of Contents