AAnalyst 200 User's Guide
Pre-Conditioning a New Burner or Drain Tube
NOTE: This is important procedure MUST be performed when a new burner or drain tubing is installed.
This procedure should be done directly after installation of a new burner and repeated if the drain
tube or any of the sample introduction system components are replaced.
In order for a new sample introduction system to aspirate sample and drain smoothly, all the
internal surfaces need to be prepared. This is easily accomplished by aspirating a 50/50 solution
of water and methanol for approximately 5 minutes.
9-21