PerkinElmer aanalyst 200 User Manual page 108

Table of Contents

Advertisement

Installation
Install the Burner Assembly
1. Carefully remove the foam packing piece from around the burner system.
2. Guide the burner assembly into the tracks of the atomizer compartment.
3. Push the burner assembly in so that the rear gas fittings line up with the gas connectors at the back of
the atomizer compartment. Push the burner assembly fully in until it clicks into place and pull the
lever forward to lock the burner assembly in place.
Connecting the Drain Vessel and the Drain Interlock
1. Locate the drain vessel. The drain tube and interlock cable will be attached to the drain vessel
retainer cap.
2. Place the drain vessel in full view on the floor in front of the instrument. Never place the drain
vessel inside a cabinet.
3. Before connecting the drain tube to the burner assembly, pour about 250 mL of water into the free
end of the drain tube to fill the drain loop and to activate the drain float.
4. Place the hose clamp over the free end of the drain tubing.
5. Carefully install the free end of the drain tubing over the drain outlet, making sure that the inner
lining of the drain tube does not get damaged.
6. Use a flat-blade screwdriver to tighten the hose clamp.
7. Plug the white drain interlock connector into the drain interlock plug on the burner assembly.
Further procedures for setting up the burner system are described in Chapter 6, Operation of the
Instrument.
5-20
Screen 5- 7 Drain hose and drain interlock
Drain Hose
Clamp
Drain Interlock
Connector

Advertisement

Table of Contents
loading

Table of Contents