Power Steering
Pump Overhaul (cont'd)
Place the side plate (A) on the cam ring, and align
the roll pin set hole (B) in the siile ptate with the roll
pin end (C).
" -(-.--E
Coat the new O-ring (D) with the power sreenng
fluid, then position it into the groove on the side
plate.
Install the pump housing (A) over lhe cover
assembly (B).
34.
17-20
\
35. Align the bolt holes in the cover (A) with the
threaded holes in the pump housing. Install the
flange bolts loosely first, then torque the flange
bolts in a criss cross pattern in two or more steps.
8 x 1,25 mm
20 N.m
{2.0 kg{.m,
14 tbf.ftl
Push in the cam ring (A) from the pump housing
cap hole (B) with a flat blade screwdriver. to make
sure the cam ring is fully seated against the outer
case.
36.
..::1.-' - _r
.l
,_.,, _r
Qr1-=-.;;.
' t