Commissioning
5.1
Commissioning guidelines
Procedure
Proceed as follows to commission the inverter:
1. Define the requirements
2. Reset the inverter when
3. Check whether the
4. Check whether you need
5. If necessary, adapt the
6. If necessary, set further
7. Save your settings.
You have commissioned the inverter.
Converter with the CU250S-2 Control Unit (vector)
Operating Instructions, 06/2013, FW V4.6, A5E31759476B AB
of your application placed
on the drive.
→ (Page 74).
required to the factory
setting.
→ (Page 83).
factory setting of the
inverter is appropriate for
your application.
If not, start with the basic
commissioning.
→ (Page 85).
to adapt the functions of
the terminal strip that you
specify in the basic
commissioning.
→ (Page 95).
communications interface
in the inverter.
→ (Page 111).
functions in the inverter.
→ (Page 215).
→ (Page 323).
5