Siemens SINAMICS G120 Operating Instructions Manual page 59

Inverter with the cu250s-2 control unit (vector)
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Terminal strips behind the lower front door
Note
If your application requires UL certification, please observe the note regarding the digital
output in Section Technical data, CU250S-2 Control Unit (Page 385).
Generally, you determine the pre-assignment of the functions of the inputs and outputs
during the basic commissioning.
Control Units, where you cannot change the pre-assignment, to not offer this step in the
basic commissioning. In this case, you must adapt the functions of the inputs and outputs
depending on the specific plant or system, as described in Section Adapt terminal strip
(Page 95).
Even if you have selected a pre-assignment in the basic commissioning, you can adapt the
individual inputs and outputs depending on the specific plant or system, as described in
Section Adapt terminal strip (Page 95).
You can find an overview of the standard assignment or the possible pre-assignments in
Section: Selecting the pre-assignment for the terminal strip (Page 60).
For a fail-safe input, you require two "standard" digital inputs.
Terminals
16
17
Converter with the CU250S-2 Control Unit (vector)
Operating Instructions, 06/2013, FW V4.6, A5E31759476B AB
Designation
Fail-safe input
DI4
F-DI0
DI5
Installing
4.4 Installing Control Unit
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents