Siemens SINAMICS G120 Operating Instructions Manual page 71

Inverter with the cu250s-2 control unit (vector)
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Connecting encoders to SUB-D connectors or via DRIVE-CLiQ in compliance with EMC
● Use shielded cables.
● Connect the cable shield in the connector housing.
● Mount a strain relief, e.g. at the shield plate of the Control Unit.
● Where the cable leaves the control cabinet, also connect the shield to the shield rail of the
Additional information on EMC-compliant installation
You can find additional information on EMC-compliant installation, design of the control
cabinet and equipotential bonding:
EMC installation guideline (http://support.automation.siemens.com/WW/view/en/60612658).
Converter with the CU250S-2 Control Unit (vector)
Operating Instructions, 06/2013, FW V4.6, A5E31759476B AB
control cabinet.
4.6 Connecting inverters in compliance with EMC
Installing
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents