Appendix
A.8 Application Examples
2. By double clicking on slot 0 in the station window, open the property window for the
inverter's network settings.
3. Select the Parameters tab.
4. Activate the standard alarms.
You have activated the diagnosis messages.
With the next ramp-up of the controller, the diagnostic messages of the inverter are then
transferred to the controller.
444
Converter with the CU250S-2 Control Unit (vector)
Operating Instructions, 06/2013, FW V4.6, A5E31759476B AB