6A–38
ENGINE MECHANICAL (X22SE 2.2L)
14. Install transmission front under cover to front portion
of clutch housing.
15. Install transmission mounting fixing bolts and nuts to
cross member.
Torque: 50 N·m (36 lb ft)
16. Install exhaust front pipe to exhaust manifold and
silencer, then tighten fixing nuts and bolts to the
specified torque.
Torque
25 N·m (18 lb ft) for nut
68 N·m (50 lb ft) for bolt
17. Install fuel piping bracket to transmission.
18. Install clutch piping bracket to right side of clutch
housing.
19. Connect ground cable connector to left and right of
front wheel arch upper side.
20. Connect cooling fan harness connector on the left of
fan shroud.
21. Connect vacuum hose to the brake booster.
22. Connect three engine harness connectors to chassis
harness of left rear side of engine compartment.
23. Install air cleaner assembly.
24. Install air duct with air cleaner cover to specified
torque.
Torque
7 N·m (5.1 lb ft) for air duct fixing
3 N·m (2.2 lb ft) for air duct clamp bolt
25. Connect throttle valve control cable to throttle valve
on the intake manifold.
Confirm the free play of throttle valve control cable.
Free play: 5.7 to 6.3 mm
26. Install engine hood to original position.
Refer to installation procedure for Body section in this
manual.
27. Install battery, connect positive cable and ground
cable.
28. Fill engine coolant to full level in the coolant reservoir
tank.
022RW014
027RW005
Need help?
Do you have a question about the 1999 RODEO and is the answer not in the manual?
Questions and answers