Isuzu 1999 RODEO Workshop Manual page 1039

Rodeo 1999
Hide thumbs Also See for 1999 RODEO:
Table of Contents

Advertisement

6E1–412 RODEO X22SE 2.2L ENGINE DRIVEABILITY AND EMISSION
2. Do not leave any scratches in the aluminum casting.
Installation Procedure
1. Install IAC valve onto the throttle body. Refer to Idle
Air Control Valve Solenoid Installation Procedure.
2. Install TPS onto the throttle body if necessary. Refer
to TPS Installation Procedure.
3. Place the gasket then the throttle body on the
manifold.
4. Install four mounting bolt. Tighten the throttle body
mounting bolt to 13.5 Nm (10 lb ft).
5. Connect coolant line and secure them with clamps.
6. Connect all vacuum hoses and secure them with
clamps if necessary.
7. Install accelerator control cable bracket onto the
throttle body.
8. Connect accelerator control cable to throttle plate.
014RX041
9. Connect electrical connector at IAC valve and TPS.
10. Install the air intake duct. Refer to Air Intake Duct
Installation Procedure.
11. Fill the cooling system with required coolant. Refer to
Engine Cooling System.
12. Connect the negative battery cable.
014RX041
014RX025
101RX002

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents