Isuzu 1999 RODEO Workshop Manual page 245

Rodeo 1999
Hide thumbs Also See for 1999 RODEO:
Table of Contents

Advertisement

4A2–12 DIFFERNTIAL (REAR)
NOTE: Do not drive in, but just temporarily set in the outer
bearing by hand, which should be indirectly pressed in
finally by tightening the flange nut.
3. By using the seal installer J–37263, install a new oil
seal (1) that has grease on seal lip.
4. Install flange.
5. The pinion washer and a new nut while holding the
pinion flange with J–8614–01.
f Tighten the nut until the pinion end play is just taken
up. Rotate the pinion while tightening the nut to seat
the bearings. Once there is not end play in the
pinion, the preload torque should be checked.
f Remove J–8614–01. Using an inch-pound torque
wrench, check to make sure the pinion preload is
equal to or slightly over the reading recorded during
removal.
425RS004
6. Install propeller shaft to the frange.
7. Install bolt and nut. Tighten the bolt and nut to the
specified torque.
Torque: 63 N·m (46 lb ft)
425RW018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents