Isuzu 1999 RODEO Workshop Manual page 306

Rodeo 1999
Hide thumbs Also See for 1999 RODEO:
Table of Contents

Advertisement

8. Install band. Note the setting direction.
installation, check that the bellows is free from
distortion.
9. Install another bellows and fix band.
10. Install the ball guide with the smaller diameter side
ahead onto the shaft.
11. Install ball retainer.
12. Using snap ring pliers, install the snap ring (1)
securing the ball retainer to the shaft.
After
13. Align the track on the ball (1) retainer with the window
in the cage, and install the six balls into position.
14. Pack 150g of the specified grease in DOJ case, then
412RS017
install drive shaft joint assembly. After reassembly,
move the DOJ longitudinally several times to get to fit.
15. Install the circlip (1) so that open ends are positioned
away from the ball groove.
412RS013
DRIVE SHAFT SYSTEM
4C–17
412RS018
412RS019

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents