To create a mass floor schedule
1 Click View tab
2 In the New Schedule dialog, do the following:
3 In the Schedule Properties dialog, do the following:
The schedule displays in the drawing area. If you included the Usage field in the schedule, you can assign
a usage to each mass floor in the schedule.
Related topics
Examples of Conceptual Design Analysis
Schedule Views
598 | Chapter 12 Massing Studies
Create panel
a For Category, click Mass Floor.
If Mass Floor does not display by default, select Show categories from all disciplines.
b For Name, specify the schedule name.
c Select Schedule building components.
d Click OK.
a On the Fields tab, select the desired fields.
See
Selecting Fields for a Schedule
b Use other tabs to specify filtering, sorting, and formatting of the schedule.
See
Specifying Schedule Properties
c Click OK.
on page 172
Schedules drop-down
on page 176.
on page 176.
on page 600
Schedule/Quantities.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 256B1-05A761-1301 - AutoCAD Revit Structure Suite 2010 and is the answer not in the manual?

Questions and answers

Table of Contents