To move a schedule section
1 Select the schedule section on the sheet.
2 Click the blue arrow control in the center of the schedule section, and drag it to a new location

Joining Split Schedules

You can rejoin the sections of a split schedule on a sheet. Schedule sections are sequential: you can join a
section with its previous or subsequent section. For example, if you split a schedule into 4 sections, you can
rejoin section 2 with section 1 or 3.
To rejoin schedule sections
1 On a sheet that displays a split schedule, drag one schedule section over the other.
2 Release the mouse button.

Adjusting Schedule Columns on a Sheet

When you place a schedule on a sheet, text that does not fit within a column wraps to a new line. To adjust
the column width, select the schedule. A blue triangle displays to the upper right of each column. Drag a
blue triangle to the left or right.
NOTE If the schedule is split into multiple sections, adjusting the width in one section changes the width in all
sections.
Split schedules after column width adjustment
Related topic
Modifying Schedules

Displaying Vertical Headings in a Schedule on a Sheet

When you place a schedule on a sheet, you can specify that one or more column headings display vertically
instead of horizontally, as shown
on the sheet.
The split schedule sections rejoin into one section.
on page 189
Adjusting Schedule Columns on a Sheet | 1065

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 256B1-05A761-1301 - AutoCAD Revit Structure Suite 2010 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents