BRP Evinrude E-TEC G2 Service Manual page 75

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Assemble the starboard lower exhaust cover to
the Starboard frame. Tighten the four screws to a
torque of 18 to 30 in. lbs. (2-3 N·m).
Place the starboard frame and starboard exhaust
housing cover on the starboard side of the out-
board. Align the frame with the groove in the
exhaust grommet.
Connect the tilt and trim connector. Assemble the
two Deutsch connectors to the bosses on inside of
the starboard frame. Place the starboard frame on
the outboard. Seat the frame in the groove of the
exhaust grommet.
1
1. Trim and Tilt connector
2. two Deutsch connector bosses
Assemble the 17 frame screws, tighten to a torque
of 18 to 30 in. lbs. (2 to 3 N·m).
5008559_18
Assemble the gearcase oil reservoir to the inside
of the starboard frame. Use a #2 Posi-drive screw-
driver to tighten the self-tapping screws.
IMPORTANT:
clockwise to start the threads and clockwise to
5008559_16
Engine Cover and Frame Service
Frame Installation
3
Turn self-tapping screws counter
2
3
5008559_17
5008559_12
75

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents