BRP Evinrude E-TEC G2 Service Manual page 313

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Wait for the button to activate BEFORE con-
tinuing.
4. Select Disable Calibration to save the settings
and re-enable the power steering pump.
1. Set Port
2. Set Starboard
3. Disable Calibration
Before calibrating the SECOND DPS outboard:
turn the key switch to the OFF position.
disconnect the battery cables at the battery for
the FIRST DPS outboard
connect the battery cables at the battery for the
SECOND DPS outboard
Turn the key switch to the ON position
4. Repeat steps 1 through 5 for the SECOND
DPS outboard.
Connect the battery cables at the battery, then test
the steering system. See Steering System Test
below.
Steering System Test
Turn the steering wheel fully to PORT. The power
steering pump should run, then shut OFF when
the engine is turned fully to PORT.
Turn the steering wheel fully to STARBOARD. The
power steering pump should run, then shut OFF
when the engine is turned fully to STARBOARD.
In some installations it may be difficult to hear the
power steering pump run. Use the Power Steering
screen of Evinrude Diagnostics software to moni-
tor the pump Current and Duty Cycle.
3
1
2
1. Pump Current
2. Duty Cycle
009400
These values should be zero when the pump is
NOT running.
Cover and Frame Installation
Install the front and port frames. Then install the
top, port, front and rear covers. Refer to Engine
Cover and Frame Service on p. 55.
DPS Module Service
2
1
Stern and Swivel
009401
13
313

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents