BRP Evinrude E-TEC G2 Service Manual page 338

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Stern and Swivel
Stern & Swivel Bracket
Install the 4 lower mount bolts.
1. Lower mount bolts (port side shown)
Tighten the nuts to a torque of 67 to 69 ft. lbs. (91
to 93 N·m).
Tighten the lower mount bolts to a torque of 40 to
42 ft. lbs. (55 to 57 N·m).
If equipped, route the DPS harnesses to the DPS
module. Connect the electrical connectors.
1
1. DPS module electrical connectors
338
1
009275
009172
Route the harnesses for the trim motor and trim
sender to the starboard side of the engine. Con-
nect the electrical connectors.
1. Trim motor electrical connector
2. Trim sender electrical connectors
Install the rigging center with four screws. Tighten
screws to a torque of 84 to 106 in. lbs. (10 to 12
N·m).
1
1. Screws (port side shown)
Install the front frame, starboard and port frames
and rear cover. Refer to Engine Cover and
Frame Service.
Next, re-connect all cables, buss cables and
hoses to the engine. Refer to Rigging Informa-
tion on p. 30.
Install the front engine cover.
2
1
009171
009424

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents