BRP Evinrude E-TEC G2 Service Manual page 267

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Powerhead
Powerhead Installation
Rear
Install the following hoses and hose clamps:
2. Install the overboard indicator to the tee fitting,
secure with a new 15.7 mm Oetiker clamp.
1. Install the supply hose to the oil pump, secure
with a new 10.5 mm Oetiker clamp.
1
2
009176
11
267

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents