BRP Evinrude E-TEC G2 Service Manual page 407

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Remove any nicks or burrs on front of bearing
housing.
1. O-ring groove
For seal and bearing service refer to Propeller
Shaft Bearing Housing Service on p. 387.
Assembly
Position the forward gear bearing housing assem-
bly on a flat, level surface. (Mirror or glass can be
used.) Use depth gauge to measure distance from
flange of housing to flat surface as shown.
1
1. Flange
Add the appropriate shims to create a dimension
of 0.140 in. (3.556 mm).
To determine thickness of shims; use the following
example:
.389 in. reading on the gauge
1
+ 0.011 in. shims required
= 1.400 in. required dimension
Apply Needle Bearing grease to the thrust bear-
ing. Position bearing around shoulder on the pro-
peller shaft.
Apply Needle Bearing grease to the thrust washer.
Place washer in recess of bearing housing.
1
009568
1. Thrust bearing
2. Thrust washer
Coat bearing surfaces of propeller shaft with gear-
case lubricant. Slide the propeller housing onto
the propeller shaft.
IMPORTANT:
propeller shaft in the bearing housing. Thrust bear-
ing must remain around shoulder on the propeller
009564
shaft.
Apply gearcase lubricant to the threads of the for-
ward gear bearing housing.
Shifter, Bearing and Seal Servicing
2
Use caution when assembling the
Gearcase
1
009565
009566
14
407

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents