BRP Evinrude E-TEC G2 Service Manual page 268

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Powerhead
Powerhead Installation
Port
Install the following:
1. The DPS module and cooling hose assembly.
Install the following hoses and hose clamps:
2. The DPS module cooling hose to the tee fitting,
secure with a new 15.7 mm Oetiker clamp.
3. The exhaust cooling hose (DPS module to
exhaust adapter) to the adapter fitting, secure
with a new 15.7 mm Oetiker clamp.
4. The Y-fitting to the exhaust adapter hose,
secure with a new 34.6 mm Oetiker clamp.
9
268
5. The thermostat hose to the exhaust adapter fit-
ting, secure with a new 21.0 mm Oetiker
clamp.
6. The exhaust back pressure hose to the
exhaust adapter fitting, secure with a new tie
strap.
Connect the electrical connectors to the following:
7. Exhaust temperature sensor
8. Shift actuator
9. DPS module
2
7
1
4
5
6
3
7
009175

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents