BRP Evinrude E-TEC G2 Service Manual page 37

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Make sure the crimp of each Oetiker clamp is
positioned forward and cannot cut into or chafe
any other cable or hose.
4
2
1
1. Clips
2. Fuel hose
3. Oil supply hose
4. Positive battery cable
Make sure there is loose slack in all hoses and
cables.
If port cable entry is used, slack should be to the
starboard side of the cable entryway.
If starboard cable entry is used, slack should be
to the port side of the cable entryway (shown
below).
1. Slack
Hoses and cables should NOT bind or be pulled
taught when engine is in a full turn.
1
3
009168
1
009169
Install cover on cable entryway with four screws.
Make sure cables are not pinched between cable
entryway cover and housing.
1. Cables NOT pinched
Install the front engine cover. Install the two upper
screws (front) first, then install the two lower
screws.
1. Upper screws (front)
2. Lower screws
Routine Service
Rigging Information
1
009170
1
2
009105
37
2

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents