8
Make sure cover plates are installed over any unused bays in all of the I/O management units. If any
are missing, insert the cover plate with the latchhooks on the right side and evenly apply pressure to
both side of the plate until the latchhooks begin to move towards the middle of the blade. Push the
latchhooks towards the middle. You will feel the latchhooks lock into place.
CAUTION
9
Detach the ESD strap.
If you are not adding any optional hardware, you are now ready to power up the library.
page 93 provides step-by-step instructions for powering up the library. If you are adding optional hardware,
see
Adding Optional Hardware
110
Slots that are not populated with blades must contain a cover plate. If
the cover plate is not installed, blade temperature errors will occur.
cover plates
on page 231.
Applying Power
on
Installing Drives and Blades