This chapter contains testing procedures for performing the following:
•
Verifying the Hardware Installation
•
Installation Verification Test Overview
•
Running the Installation Verification Test
•
Completing the Installation Verification Checklist
Verifying the Hardware Installation
To verify the hardware, follow these steps:
1
Verify that the library is leveled based on the instructions in
page 19 and
Installing a Multi-Module Library
2
Close the access door.
3
Verify that the Robotics Enabled and Status indicators above the Library Management Console (LMC)
are illuminated in solid green state.
Robotics Enabled
indicator/button
touch screen
Scalar i6000 Installation Guide
Installation Testing and Verification
on page 307
on page 309
on page 325
on page 27.
on page 332
Installing a Stand-Alone Control Module
Status indicator
Power indicator/button
on
307