A/C System Inspection At Ecm - Suzuki GRAND VITARA Owner's Manual

Grand vitara
Hide thumbs Also See for GRAND VITARA:
Table of Contents

Advertisement

Reference waveform No. 1
Serial communication line to BCM (1)
Measurement terminal
Oscilloscope setting
Measurement condition

A/C System Inspection at ECM

CAUTION
!
• ECM connectors are waterproofed. Each
terminal of the ECM connectors is sealed
up with the grommet. Therefore, do not
measure circuit voltage and resistance by
inserting the tester's probe into the sealed
terminal at the harness side. Or, ECM and
its circuits may be damaged by water.
• ECM (PCM) cannot be checked by itself.
It is strictly prohibited to connect voltmeter
or ohmmeter to ECM (PCM) with couplers
disconnected from it.
CH1: "G52-11" to "G52-
17"
CH1: 5 V / DIV
TIME: 20 ms / DIV
Ignition switch is at ON
position
I5JB0A720091-01
S5JB0A7204051
Air Conditioning System:
Voltage Check
ECM (PCM) and its circuits can be checked at ECM
(PCM) wiring couplers by measuring voltage as follows.
Refer to "Inspection of ECM and Its Circuits: in Section
1A".
• C37-12 A/C refrigerant pressure sensor signal
• C37-14 Output of 5 V power source
• C37-15 Ground for ECM
• C37-24 Engine coolant temp. (ECT) sensor signal
• C37-29 Ground for ECM
• C37-30 Ground for ECM
• C37-48 Ground for ECM
• C37-52 CMP sensor signal
• C37-57 Ground for sensors
• C37-58 Ground for ECM
• E23-4 CAN (high) communication line (active high
signal) to ABS control module
• E23-16 Main power supply
• E23-19 CAN (low) communication line (active low
signal) to ABS control module
• E23-46 Radiator fan relay No.1 output
• E23-47 Radiator fan relay No.2 output
• E23-48 Radiator fan relay No.3 output
• E23-49 A/C compressor relay output
7B-58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents