Plug And Play Operation - Avaya G250 Administration

Media gateways
Hide thumbs Also See for G250:
Table of Contents

Advertisement

Configuring PoE
Figure 26: Powered Device Detection

Plug and Play Operation

You can add and remove PDs without manually reconfiguring the switch, since it performs a
periodic automatic load detection scan on non-powered ports.
If a PD that fits the above criteria is detected on a non-powered port, then power is applied
to the port.
If a PD is removed from a port, then power is denied to that port. The disconnected port is
then scanned as well.
In addition, if the PoE module in the G350 is removed and replaced with a module of the same
type, the port power configuration of the module is retained.
280 Administration for the Avaya G250 and Avaya G350 Media Gateways

Advertisement

Table of Contents
loading

This manual is also suitable for:

G350

Table of Contents