It is not allowed to enter test group view or test type view after a test group is scheduled.
At present, the configuration of the end time of an NQA test is not supported on the device, and you
need to use the undo nqa schedule command to end an NQA test.
Examples
# Start a test for the test group with the administrator name admin and operation tag test.
<Sysname> system-view
[Sysname] nqa schedule admin test start-time now lifetime forever
operation (FTP test type view)
Syntax
operation { get | put }
undo operation
View
FTP test type view
Default Level
2: System level
Parameters
get: Obtains a file from the FTP server.
put: Transfers a file to the FTP server.
Description
Use the operation command to configure the FTP operation type.
Use the undo operation command to restore the default.
By default, the FTP operation type is get.
Examples
# Configure the FTP operation type as put.
<Sysname> system-view
[Sysname] nqa entry admin test
[Sysname-nqa-admin-test] type ftp
[Sysname-nqa-admin-test-ftp] operation put
operation (HTTP test type view)
Syntax
operation { get | post }
undo operation
View
HTTP test type view
1-14
Need help?
Do you have a question about the S7906E and is the answer not in the manual?
Questions and answers