1MRS759142 F
In the permissive overreach scheme, the received signal CR_PRM, or CRL if the
unblocking function is enabled, is used to allow the overreaching zone Z2 to trip
(activation of the OPERATE output) after the settable pick-up delay
Time . The start signal from the overreaching zone is connected to the CACC input.
Activating the BLOCK input totally blocks the permissive overreach scheme. The
CS_PRM and OPERATE outputs can be blocked by the BLK_CS_OPR input.
Bus A
~
Z2_START
Figure 706: Simplified functional diagram of the permissive overreach scheme
Directional comparison blocking scheme DCB
The directional comparison blocking scheme is enabled with
"Blocking".
In the blocking scheme, the start signal from the reverse-looking zone Z3 is
connected to the CSBLK input to create a CS_BLOCKING signal. The starting of the
reverselooking zone indicates that the fault is located outside the protected feeder.
The duration of the CSBLK input signal can be prolonged with the
setting to ensure a sufficient duration of the CS_BLOCKING signal.
The blocking scheme is mainly used to allow the overreaching zone Z2 to trip
(activation of the OPERATE output) after the settable
elapsed, and if no blocking signal is received from the remote terminal. To prevent
a false trip in case of an external fault, the block signal CR_BLOCKING must be
received before the
overreaching zone Z2 is connected to the CACC input.
REX640
Technical Manual
Z1
3
CB_A
Z2
TRIP_CB_A
Coordination Time has elapsed. The start signal from the
Coordination Time setting in the blocking scheme depends, for
The
example, on the communication system delay and on the terminal's
Protection related functions
Z2
CB_B
Z1
Z2_START
Z1_START
Coordination Time has
Coordination
Bus B
~
3
TRIP_CB_B
Scheme type =
Carrier Min Dur