Nortel Millennium M1000 Manual page 230

Multi-pay-based terminal replacing part
Table of Contents

Advertisement

rprbk203 Page 48 Tuesday, February 16, 1999 9:12 AM
6-48 Coin path modules
Figure 6-39: Flowchart — installing the coin return and bracket
At the terminal:
Follow all the steps for
preparing the terminal for
maintenance, including:
• Access the terminal and
open the housing.
• Connect ESD strap
inside the terminal.
Remove retaining screw
Are you
installing a
coin return
bracket
upgrade?
Yes
NTP: 506-6501-203 Issue: 00.01 Status: Standard Date: June 1998
Remove coin return
bracket (if there is one)
Remove coin return
and install a new one
Install coin return
bracket (if there
is one)
Install retaining screw
Disconnect ESD
wrist band
No
Close and lock
terminal housing
Test terminal function

Advertisement

Table of Contents
loading

Table of Contents