Nortel Millennium M1000 Manual page 173

Multi-pay-based terminal replacing part
Table of Contents

Advertisement

rprbk203 Page 31 Tuesday, February 16, 1999 9:12 AM
Figure 5-29: Positioning the hookswitch rain shield
Hookswitch
rain shield
Hole for
switch
Rain shield
fits around
screw mount
VFD
Figure 5-30: Underside of Module B (external interface)
Ribbon cable
connects to
telephony PCP
b) Install the external interface hookswitch assembly:
• Fit the hookswitch on the module into the
rectangular hole in the rain shield. This
switch is located on the underside of the
hookswitch PCP, shown in Figure 5-30.
• Hold the hookswitch PCP so that the
connectors are facing down and install it in
the terminal by reversing the steps 2 to 4.
Holes fit over
screw mounts
Switch actuator
(fits into hole in
rain shield)
Smart card alert connector (J52)
(alerter connection if there is
no smart card alert)
Millennium Multi-pay-based terminals: replacing parts
Card and hookswitch parts 5-31
Top of
front
housing
Connector
for keypad
mylar cable
(J53)

Advertisement

Table of Contents
loading

Table of Contents