Nortel Millennium M1000 Manual page 190

Multi-pay-based terminal replacing part
Table of Contents

Advertisement

rprbk203 Page 8 Tuesday, February 16, 1999 9:12 AM
6-8 Coin path modules
Figure 6-6: Locating the validator retaining clip
Rear housing
Validator
Validator
coin return chute
Projection on escrow
Retaining clip
on validator
Validator slides into
escrow chute
NTP: 506-6501-203 Issue: 00.01 Status: Standard Date: June 1998
2. Disconnect the validator cable (J33) from the control
PCP connector (J8).
3. Feed the cable under the PCP assembly.
4. Disconnect the validator cable (J21) from the escrow
connector (PL5)
5. Remove the packing foam block above the validator
and discard.
6. Release the retaining clip securing the validator to the
escrow, indicated in Figure 6-6.
Escrow
7. Slide the validator up until the large portion of the key-
hole is aligned with the validator retaining screw.
Refer to Figure 6-7.
8. Remove the validator by tilting the top back and then
lifting it up and out of the housing.

Advertisement

Table of Contents
loading

Table of Contents