Sign In
Upload
Manuals
Brands
Nortel Manuals
Touch terminals
Millennium M1001
Nortel Millennium M1001 Manuals
Manuals and User Guides for Nortel Millennium M1001. We have
1
Nortel Millennium M1001 manual available for free PDF download: Manual
Nortel Millennium M1001 Manual (260 pages)
Multi-pay-based terminal Replacing part
Brand:
Nortel
| Category:
Touch terminals
| Size: 4.25 MB
Table of Contents
Table of Contents
7
Introduction
15
How this Guide Is Organized
16
Accessing the Terminal
16
Replaceable Components
17
Figure 1-1: Special Terminals
19
Figure 1-2: Replaceable Parts, Exterior
20
Figure 1-3: Replaceable Parts, Internal
21
Figure 1-4: Through-Hole and Multi-Application Control Pcps
22
Identifying the Terminal Type
23
Figure 1-5: Locating the Product ID Label
23
Telephony/Control Board Identification
24
Suggested Tools and Equipment Required
25
Setup/Restore Flowchart
26
Figure 1-6: Flowchart - Setting up for Maintenance
26
Accessing the Terminal
29
Before You Enter the Terminal
29
Saving Call Detail Records (Cdrs)
30
Preparing the Terminal for Maintenance
31
Figure 2-1: Locking Tools for the Upper Housing
32
If You Need to Uninstall the Terminal
34
Opening and Closing the Terminal
34
Opening the Unlocked Terminal
35
Figure 2-2: Locating the Terminal Block Connector
35
Figure 2-3: ESD and Power Connections
36
Figure 2-4: IAS Module Location Inside the Rear Housing
37
Restoring the Terminal to Operation
38
Replacing the Front Housing Assembly
41
Flowchart
41
Figure 2-5: Flowchart - Replacing the Front Housing
41
Replacing the Front Housing Assembly
42
Figure 2-6: Disconnecting Rear Housing Cables
44
Figure 2-7: Link Bracket on the Rear Housing
44
Figure 2-8: Removing the Housing Assembly from the Hinges
45
Replacing the Upper Housing Lock
46
Flowchart
46
Figure 2-9: Flowchart - Replacing the Upper Housing Lock
46
Replacing the Upper Lock
47
Figure 2-10: Securing the Upper Housing Lock to the Terminal
47
Figure 2-11: Securing the Grounding Strap to the Swivel and Lock
48
Installing the Grounding Strap
49
Figure 2-12: Attaching the Grounding Strap
49
Replacing the Handset, Cord, and Swivel
50
Flowchart
51
Replacing the Swivel/Handset Assembly
52
Replacing the Rear Terminal PCP
56
Flowchart
56
Replacing the Rear Terminal Board
58
Describing the IAS Module
60
Installing the Rain Diverter
60
Flowchart
62
Installing an IAS Module
63
Installing an IAS Mounting Bracket
64
Connecting an IAS Module
65
PCP Assembly Components
69
Removing the PCP Assembly
70
Flowchart
71
Working with the PCP Assembly
73
Removing the Telephony or Control Pcps
79
Replacing Firmware on the Control PCP
82
Using Secure Application Modules (Sams)
87
Replacing the SAM
87
Reinstalling the SAM Daughter Board
90
Smartcity - Checking SAM Function
93
Installing Smart Card Alert (SCA)
94
Flowchart
94
Replacing the SCA Daughter Board
96
Connecting SCA to the Multi-Application PCP
102
Upper Bezel Components
107
Replacing the VFD
108
Flowchart
109
Replacing the Two-Line VFD
110
Replacing the Graphical Display Assembly
113
Replacing the Abrasion Shield
120
Replacing the Quick Access Keys Bezel
122
Flowchart
122
Replacing Quick Access Keys
124
Replacing the Label Card
126
Replacing the Upper Bezel Assembly
127
Flowchart
128
Replacing the Upper Bezel Assembly
130
Replacing the Display Window
136
Flowchart
137
Replacing the Window
138
Installing an Internal Instruction Card
140
Replacing the External Instruction Card
141
Card and Hookswitch Parts
143
Working with the Card Reader Assembly
144
Flowchart
144
Replacing Card Reader Assembly Parts
145
Folding the Card Reader Cable
153
Identifying Datajack Hardware
154
Installing a Card Reader Datajack Bezel
156
Making a Datajack Call
160
Replacing the Alerter Module
161
Flowchart
162
Steps for Replacing the Alerter Module
163
Replacing the Hookswitch Module
167
Flowchart
169
Replacing the Hookswitch
170
Replacing the Hookswitch/Alerter Bezel
175
Flowchart
176
Replacing the Bezel
177
Replacing the Number Card
179
Coin Path Modules
183
Performing a Coin Box Collection
185
When to Do a Collection
185
Collecting the Coin Box
185
Replacing Coin Modules Flowchart
186
Replacing the Coin Validator
188
Replacing the Coin Escrow
197
Replacing the Coin Guide
203
Working Inside the Coin Vault
206
Flowchart
206
Replacing the Vault Door or the Coin Box
207
Accessing the Coin Vault
208
Working with the Coin Box Rail
210
Replacing the Coin Box Rail
211
Upgraded Coin Box Rail
214
Replacing the Security PCP
216
Simulating a Coin Collection
219
Replacing the Coin Vault Lock
220
Replacing a Mechanical Lock
221
Coin Vault Lock Upgrade
223
About the E-Lock Security Switch
224
Working with the Coin Return Assembly
229
Replacing the Coin Return Assembly
231
Coin Return Bracket Upgrade
233
About the Coin Basic Portable Display
240
Installing a Portable Display
243
Re-Entering the Craft Interface
246
Removing the Coin Basic Portable Display
248
Advertisement
Advertisement
Related Products
Nortel Millennium Desk
Nortel Millennium M1000
Nortel Millennium Card
Nortel Millennium Inmate
Nortel Millennium Series
Nortel Meridian M1250
Nortel Millennium multi-pay M1211
Nortel Millennium multi-pay M1221
Nortel Millennium multi-pay M1231
Nortel Meridian M5312
Nortel Categories
IP Phone
Telephone
Switch
Software
Server
More Nortel Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL