Nortel Millennium M1000 Manual page 227

Multi-pay-based terminal replacing part
Table of Contents

Advertisement

rprbk203 Page 45 Tuesday, February 16, 1999 9:12 AM
Figure 6-36: Switch fits under e-lock housing
e-lock
bottom
bracket
e-lock housing
Cable and connector (J31)
(connect to rear terminal PCP)
Note looped connection for
bolt monitoring wire
The two holes in the switch mount will match the two
bottom holes of the lock.
Refer to Figure 6-36.
10. Insert the two screws under the e-lock that hold the
switch in place.
11. Open the terminal housing and locate where the
switch cable was pushed up through the floor of the
rear housing.
a) Thread the cable through the cable clamp located
on the side of the rear housing.
b) Connect the cable connector to the connector on
the rear terminal PCP.
c) Ensure the connector is properly seated.
12. Insert the coin box into the vault.
Refer to Figure 6-37.
Millennium Multi-pay-based terminals: replacing parts
Coin path modules 6-45
Two screws
secure the
switch beneath
the e-lock
Screw securing
switch to bracket
Switch bracket
Security switch

Advertisement

Table of Contents
loading

Table of Contents