rprbk203 Page 18 Tuesday, February 16, 1999 9:12 AM
6-18 Coin path modules
Figure 6-15: Positioning the escrow module
Bottom of
validator fits
here
Escrow
Hinge
of rear
housing
Securing tab
NTP: 506-6501-203 Issue: 00.01 Status: Standard Date: June 1998
5. To clear a jam, do the following:
a) Turn the escrow upside down, and rock the unit
from side to side. Coins or debris will empty out,
clearing the blockage.
WARNING
• Do not under any circumstanc-
• Attempting to clear the jam in
b) If the jam cannot be cleared, replace the escrow
and send the jammed escrow for repair.
6. To replace the escrow, reverse Steps 1 to 4.
•
Align the locating pin with the cut-out on the vault
top.
•
Tighten the escrow retaining lock nut only until the
escrow becomes slightly snug.
Locating pin
es insert any object, such as
screwdrivers, metal rods, or fin-
gers, into the escrow unit.
this manner may cause perma-
nent damage to the escrow.