Nortel Millennium M1000 Manual page 13

Multi-pay-based terminal replacing part
Table of Contents

Advertisement

rprbk203 Page xiii Tuesday, February 16, 1999 9:12 AM
Figure 5-13: Identifying a multi-application control PCP
Figure 5-14: Datajack plug fits into card reader bezel
Figure 5-15: Installing the teladapt support inside the bezel
Figure 5-16: Datajack connector with shorting loop
Figure 5-17: Locating the alerter module
Figure 5-18: Flowchart — replacing the alerter module
Figure 5-19: Bezel A alerter connector on keypad PCP
Figure 5-20: Bezel B alerter connection to hookswitch
Figure 5-21: Locating the alerter module
Figure 5-22: External aspect of the hookswitch
Figure 5-23: Module A — identifying the hookswitch
Figure 5-24: Module B— identifying the external interface hookswitch 5-26
Figure 5-25: Flowchart — replacing the hookswitch module
Figure 5-26: Module A — hookswitch connects to keypad PCP
Figure 5-27: Module B— keypad connects to hookswitch
Figure 5-28: Hookswitch PCP screws
Figure 5-29: Positioning the hookswitch rain shield
Figure 5-30: Underside of Module B (external interface)
Figure 5-31: Hookswitch/alerter bezel, exterior view
Figure 5-32: Flowchart — replacing the hookswitch/alerter bezel
Figure 5-33: Hookswitch bezel screws
Figure 5-34: External view of number card window
Figure 5-35: Number card access hole
6 Coin path modules
Figure 6-1: External aspects of the coin path
Figure 6-2: Internal aspects of the coin path
Figure 6-3: Flowchart — replacing the validator or escrow, page 1
Figure 6-4: Flowchart — replacing the validator or escrow, page 2
Figure 6-5: Validator cable connections
Figure 6-6: Locating the validator retaining clip
Figure 6-7: Lifting the validator off the retaining screw
Figure 6-8: Showing the coin rejection chute on the validator
Figure 6-9: Exploded view of the coin validator
Figure 6-10: Exploded view of the validator with runway pins
Figure 6-11: Locating the coin rejection chute partition
Figure 6-12: Reinstalling the validator
Figure 6-13: Locating the escrow in the coin path
Figure 6-14: Coin escrow hex nut inside the coin vault
Figure 6-15: Positioning the escrow module
Figure 6-16: Positioning the escrow rain shield
Figure 6-17: Locating the coin guide on the terminal exterior
Millennium Multi-pay-based terminals: replacing parts
Table of contents xiii
5-13
5-14
5-16
5-18
5-19
5-20
5-22
5-23
5-24
5-25
5-26
5-27
5-29
5-29
5-30
5-31
5-31
5-33
5-34
5-36
5-37
5-38
6-2
6-2
6-4
6-5
6-7
6-8
6-9
6-9
6-10
6-11
6-12
6-14
6-15
6-17
6-18
6-19
6-21

Advertisement

Table of Contents
loading

Table of Contents