Nortel Millennium M1000 Manual page 193

Multi-pay-based terminal replacing part
Table of Contents

Advertisement

rprbk203 Page 11 Tuesday, February 16, 1999 9:12 AM
Figure 6-10: Exploded view of the validator with runway pins
Upper runway cover
9. When you remove the validator from the terminal, do a
visual check first to see if the coin chute is clear.
10. Clear it, if necessary.
11. If the coin is stuck further down, you may need to re-
move the coin rejection chute and the upper and/or
lower runway covers to clear the coin path. Refer to
Figure 6-9.
To remove these parts:
a) To remove the coin rejection chute, squeeze the
long sides to free the tabs and pull it off.
b) To remove the upper and/or lower runway covers,
remove both steel hinge rods found on either side
of the validator housing.
See this
If the terminal has the three vali-
dator runway pins, either remove
them or tape them down until you
are ready to replace the upper
housing assembly.
Refer to Figure 6-10.
Millennium Multi-pay-based terminals: replacing parts
Coin path modules 6-11
Validator
Coin path
runway pins
entry
Main
validator
housing

Advertisement

Table of Contents
loading

Table of Contents